• -56%

IEEE 336-2020

$56.00
$24.64 Save 56%

Quantity

  Security policy

(edit with the Customer Reassurance module)

  Delivery policy

(edit with the Customer Reassurance module)

  Return policy

(edit with the Customer Reassurance module)

Full Description

Scope

This recommended practice provides considerations for the pre-installation, installation, inspection, and testing of Class 1E power, instrumentation, and control equipment and systems of a nuclear facility while in the process of installing, inspecting, and testing during new construction, modification, and maintenance. This recommended practice does not apply to periodic surveillance testing.

Purpose

The purpose of this recommended practice is to identify the activities, instructions, and attributes that should be considered in the process of installing, inspecting, and testing during new construction, modification, and maintenance for Class 1E power, instrumentation, and control equipment at nuclear facilities.

Abstract

Revision Standard - Active.Considerations for the pre-installation, installation, inspection, and testing of Class 1E power, instrumentation, and control equipment and systems of a nuclear facility while in the process of installing, inspecting, and testing during new construction, modification, or maintenance are provided in this recommended practice. This recommended practice does not apply to periodic surveillance testing. For purposes of this recommended practice, in addition to a nuclear power plant, a nuclear facility is defined as a facility related to the nuclear fuel cycle from fuel processing to reprocessing and waste management.

R00007930
8130 Items
chat Comments (0)
No customer reviews for the moment.